Inventing machines for the food industries requires much sophistication, time, and accurate measurements that must strictly adhere to the standards set out in the food industry. For mixers and blenders to conveyors and packer machinery, each design must specifically tailor to unique production demands, safety requirements, or efficiency goals. But this is exactly what pre-designed designs help cut down to a large extent, thus taking the development time of machinery considerably less, bypassing the long design stages for the manufacturers and going directly into production. Here's how long machine design takes normally-and how pre-designed designs cut that down.
1. Initial Consultation and Requirements Gathering (1-2 Weeks)
This period enables designers to obtain vital information like the production targets, sanitation requirements, and special demands. Applying the available designs, this period can be reduced since several design requirements would have already been covered; the designer would only fine-tune instead of designing the actual plan.
2. Preliminary Design and Concept Development (2-4 weeks)
Once the requirements are well defined, designers typically start concept development with initial sketches or CAD models. When there is a pre-existing design, designers avoid the development of a concept and move straight to small modifications. In such cases, this phase would take weeks to only days.
3. Detailed Design and Engineering (4-6 Weeks)
In great detail, engineering concerns developing realistic models and technical drawing and that can take weeks on customized designs. For any given pre-made design, a part of this has been done, and final review and approval can take place directly.
4. Review and Revisions: (1-2 weeks).
Every design of machine is somehow revised and reviewed, most especially when in demand by the concerned stakeholders involved. A pre-designed has a clear history document and already been 'tested' in functionality by others, thus reducing potential adjustments, thereby reducing its time to be revised.
In Total: This usually takes 8 to 12 weeks for an average machine design in the food industry. But if these are pre-made designs, they can really cut short that timeline. This makes the manufacturer come up sooner to production with the same machine. Using pre-made designs provides the clients with fast lead times, cost-saving benefits, and a streamlined experience of designing.